Springfield House

 

Springfield House, located in Honingham, Norfolk, is a Code 6, 2-bedroom dwelling in a rural setting. and was featured on Channel 4’s Grand Designs in 2014.

ROLE OF NBT 
In order to meet the requirements for this project, which was one of the lowest impact schemes ever being built in Norfolk, all of the materials used had to match the stringent requirements of low energy, low impact and sustainability.

NBT were involved all the way through the design process, advising on specification and technical support to achieve the ambitious targets of Code level 6. Detailed design support was provided for all the key elements of the thermal shell too.

The key areas where support was provided:

  • Specification of high performance woodfibre insulation for the walls
  • Detailed design drawings
  • Detailing for air-tightness
  • Supplying specified products

CHALLENGES FACED
The bespoke design requirements were the biggest challenge. Work was needed to facilitate intersections of different façade finishes. A suitable texture for the render finish was created, and after a lot of experiments a suitable lime render texture and colour were identified.

MATERIALS AND PRODUCTS USED
The materials used included Pavatherm Plus for the open cedar timber cladding. Diffutherm with Creativ Top lime render was also used (the timber studs were filled with blown cellulose insulation). The structure utilises the open timber cladding on the ground floor with the render used on the lower ground floor.

These materials and the way they were used were the best in order to meet the requirements for ‘low environmental impact’, ‘exceptional quality’ and design to ‘the highest architectural standards’ (as stipulated by Paragraph 55 of the National Planning Policy Framework). The Pavatex materials enabled optimum of breath-ability through the thermal envelope of the building.

PROJECT STATISTICS
Floor area: 168m2
EPC rating achieved: A

Airtightness Level achieved: target was 3 m3/m2/hr. As built was 1.2 m3/m2/hr
U-Values achieved: U values of wall 0.14, (roof 0.14, floor 0.17 neither were our systems)
Primary energy use: 45 kWh/m2/yr